All Levels Access Platforms, safety and hire advice for UK trades

All Levels Access

Platforms, safety and hire advice for UK trades

Latest Articles

The Machine's on Site, the Job's on Hold: Who Actually Pays for a Stalled MEWP Hire?
Hire Advice

The Machine's on Site, the Job's on Hold: Who Actually Pays for a Stalled MEWP Hire?

Breakdown cover doesn't cover your losses, off-hire isn't a phone call, and a windy Tuesday is still a chargeable Tuesday. A blunt look at the clauses in UK MEWP hire agreements that catch hirers out when the job stops but the meter doesn't.

Load Limits, Lift Doors and Lobby Corners: When the Building Decides Your Access Kit
Equipment Guides

Load Limits, Lift Doors and Lobby Corners: When the Building Decides Your Access Kit

Working height is the easy number to pick. The awkward part is everything between the yard and the ceiling — slab capacity, point loads, lift dimensions and doorways that were sized for a trolley, not a scissor lift. Here's how facilities managers and trades can survey a building before booking anything.

Beyond the Cones: Building a MEWP Drop Zone That Actually Keeps People Out
Equipment Guides

Beyond the Cones: Building a MEWP Drop Zone That Actually Keeps People Out

Most MEWP exclusion zones are drawn once, taped down and quietly ignored by lunchtime. This is a practical look at barrier placement, spotters, pedestrian routes and the toolbox-talk wording that makes a drop zone hold up when another trade wants to walk underneath 'just for a minute'.

Small Machine, Shorter Day: Why Over-Hiring Access Equipment Backfires
Hire Advice

Small Machine, Shorter Day: Why Over-Hiring Access Equipment Backfires

Hiring the biggest MEWP on the list can feel like the safe choice, but over-specifying access equipment often adds transport problems, floor-loading worries and yard manoeuvring headaches. This opinion-led guide makes the case for matching the machine to the actual job.

Scuffs, Fuel and the Paper Trail: Handing a MEWP Back Without Paying for Someone Else's Damage
Hire Advice

Scuffs, Fuel and the Paper Trail: Handing a MEWP Back Without Paying for Someone Else's Damage

The machine goes back on a Friday, and three weeks later there's an invoice on your desk for a cracked cowling you never touched. Here's how to run an off-hire inspection properly — from the damage waiver small print to the photos that end the argument before it starts.

The Ground Under the Outrigger: Why 'It Looks Solid' Isn't a Load Calculation
Equipment Guides

The Ground Under the Outrigger: Why 'It Looks Solid' Isn't a Load Calculation

Everyone checks the machine. Almost nobody checks what's holding it up. A look at point loading, outrigger pad pressure, spreader mats, London clay, made ground and old service ducts — and the checks worth doing before a boom lift goes up.

Hire Advice

Lowering the Basket Isn't a Paragraph: How to Build a MEWP Rescue Plan That Works Under Pressure

A rescue plan that lives in a folder and gets ticked off in the RAMS is not a rescue plan — it's a paragraph. Here's what a workable MEWP emergency descent setup actually needs, from named roles and secondary lowering controls to the drill that tells you whether any of it would hold up on the day.

Alleyways, Arches and Awkward Corners: Picking Access Kit for Sites That Won't Take a Standard MEWP
Equipment Guides

Alleyways, Arches and Awkward Corners: Picking Access Kit for Sites That Won't Take a Standard MEWP

Some sites simply will not swallow a standard boom lift, and forcing the issue is how frontages get damaged and neighbours get annoyed. Here's how spider lifts, narrow-chassis machines, towers and podium steps stack up against real UK constraints, plus a framework for choosing before you ring the hire desk.

Three Ways Up: Picking Low-Level Access Kit That Suits the Job
Equipment Guides

Three Ways Up: Picking Low-Level Access Kit That Suits the Job

Podium steps, mobile towers and scissor lifts all get you to a ceiling tile under four metres, but they are not interchangeable. A practical comparison for facilities teams who want the choice to follow the task rather than the habit.

Twelve Things to Settle Before a Winter MEWP Hire Lands on Your Yard
Hire Advice

Twelve Things to Settle Before a Winter MEWP Hire Lands on Your Yard

Cold snaps, soggy ground and short days turn a straightforward platform hire into a week of headaches if nobody asks the awkward questions early. Here are the twelve points we would nail down before the low loader leaves the depot.